Pool Construction Process

SWIMMING POOL CONSTRUCTION PROCESS


LAYOUT & EXCAVATION

First, our workers will mark your yard with waterproof spray paint to indicate where the pool will be located. We will then enter your backyard to excavate the appropriate area which will perfectly hold the shell of your swimming pool.

POOL SETTING & BACKFILL

Next, we will schedule your pool to be picked up, shipped, and set perfectly into the excavated area by an oversized crane. We will connect the appropriate pipes for plumbing and complete the process of backfilling to allow your pool to correctly settle.

PLUMBING & ELECTRICAL

We will then dig trenches that will allow us to connect our pipes to your pump and your pool equipment to your electric panel and ensure everything is connected.

DECKING

Next, we will surround your pool with up to four feet of concrete before coating it and painting it in the color of your choosing.

CLEANING & STARTUP

We will then work on cleaning your yard from any materials or empty boxes that may have accumulated during the process. If a wall needed to be taken down during the excavation process, we will restructure the wall and include a gate.

FINAL INSPECTION & POOL SCHOOL

Finally, we will schedule a final inspection with the city in which a representative will visit your home and conclude your swimming pool abides by their requirements. Afterward, we will send our pool expert to instruct you on how to maintain your pool and keep it in perfect working order.

 